Wednesday, 6 January 2010

Villa Benara

Okay, where are we now?

January 2010

The Villa is finished and furnished.

There are some minor electrics to be completed relating to the remote switches for the lights in and around the pool area.

The only other signifcant works to be done is hard landscaping in the form of the building of some walls to the east of the Villa, steps to the pool and a large wall to the west of the villa adjacent to the track. Once built these will 'frame' the area for soft landscaping at which point we can start planting.

We are hopeful that the hard landscaping will be finished by the spring.

Here are some photos of the interior and exterior.

South Eastern aspect of the villa:


The lounge from the kitchen:

The kitchen from the lounge:

The sunken bath in the en-suite:

Master bedroom:

Mimi on steps down from master bedroom:

Lounge from entrance:

Villa, pool and walling:

Pool from Villa:

Pool from lower wall: