We have now reached early May 2008 and construction is progressing well!

The next pictures show, in part, the tile work inside and out.

The first picture shows the main lounge area with the newly built steps and dividing wall separating the 'floors'. After much consideration we decided on a glass block panel as feature to finish the 'hole' in the wall.


The external tiling shown is to the rear of the house and with the tiling done this area was pretty much complete. Note downpipe is copper!